Summer 2013 SWEN 6837.03 Capstone Assignment

 

The students will develop a Risk Management paradigm (procedure, process) described in “A Guide to the Project Management Body of Knowledge (PMBOK Guide).  In the PMBOK there are five project process groups:

  1. Initiating
  2. Planning
  3. Executing
  4. Monitoring and Controlling
  5. Closing

The PMBOK also has a Project Risk Management knowledge area which uses a Risk Register. The Risk Register is similar to the Carnegie Mellon Institute (CMI) Software Engineering Risk Information Sheet used in Software Risk Management.

Assignment:

Use the information from Module 1 Introduction and the above five process groups to write your paper showing the PMBOK Risk Register Form/Log implementation similar to the CMI Risk Information Sheet.

Reference Text: Hall, Elaine M., Managing Risk: Methods for Software Systems Development, Addison-Wesley, 2001. ISBN 0-201-25592-8  (Part IV & V)

Chapter 15, Figure 15.1 Risk Information Form   Example

Reference Text: Dorofee, A. J.; Walker, J.A.; Alberts, C.J.; Higuera, R. P.; Murphy, R. L.; Williams, R. C., Continuous Risk Management Guidebook, Pittsburg,Pa.: Software Engineering Institute, Carnegie Mellon University, 1996